Skip to content
Integrated Industrial Automation of a Pneumatics System
(IIAPS)
Menu
Project Overview
Project Data & Results
Virtual Model
System Analysis
Test Configurations
Final Test Analysis & Results
Technical Overview
Overview
Project Standards
Mechanical Standards
Electronic Standards
Electrical Standards
CDQ Standards
Mechanical Subsystem
Mechanical Overview
Final Design Concept
Piping Assembly
Pipe Support Analysis
Electronic Subsystem
Electronic Overview
Electronic Hardware Connections
Electronic Analysis
Electrical Subsystem
Electrical Overview
Power/Electrical Distribution
Electrical Analysis/Tests
Communications and Data Acquisition (CDQ)
CDQ Overview
Programming Logic
Trade Studies
Mechanical Components Trade Studies
Electronic Hardware Trade Studies
Electrical Trade Studies
Software Trade Studies
Logistics
Meet the Team
Sponsors
Piping Assembly
Assembly Plan as of 2.27.2020
: